Bishop Ryan Highschool
SERVICES USED TO COMPLETE THIS PROJECT
  • BAS / ControlsBAS /
    Controls
  • HVAC ServicesHVAC
    Services
  • Plumbing ServicesPlumbing
    Services

Project Details

Project Date: 2014

Client: Hamilton Wentworth Catholic District School Board

Location: Hamilton, ON

Category: Educational

About this Project

Bishop Ryan Highschool

Bishop Ryan Catholic Secondary School had been at it’s previous location for over 20 years before the rapidly growing population of the Stoney Creek Area required the new two-storey 190,000 square ft. 1,455-student Bishop Ryan Catholic School to be built.

Mattina Mechanical Limited was engaged as a Sub-Contractor on the new educational facility with Tambro Construction for seismic restraint systems, vibration isolation, thermal insulation, heating and cooling pumps, automatic sprinkler system, plumbing specialties, fixtures and trim, air conditioning split system, outdoor air handling units, solar wall, floor heating system, custom make-up air units and BAS controls.